Bathrooms are small rooms with expensive problems. Water, tile and plumbing all meet in a few square feet, and the cost depends less on size than on what you change. Here are typical 2026 costs for Seattle-area bathroom projects and what moves the price.
Seattle bathroom remodel costs at a glance
| Project | What it includes | Typical cost | Timeline |
|---|---|---|---|
| Bathroom refresh | Vanity, fixtures, flooring, paint; same layout | $10,000–$20,000 | 1–2 weeks |
| Tub-to-shower conversion | Tub out, waterproofed low-curb tiled shower, glass | $10,000–$25,000 | 1–2 weeks |
| Walk-in tiled shower | Waterproofed pan, wall tile, niche, glass | $12,000–$30,000 | 2–3 weeks |
| Full bathroom remodel | Gut to studs, new shower or tub, tile, vanity, fan | $25,000–$60,000 | 3–6 weeks |
| Primary bathroom renovation | Layout changes, double vanity, large shower, high-end tile | $60,000–$120,000+ | 6–10 weeks |

Why waterproofing matters more than tile
Most failed bathrooms we tear out in the Seattle area failed behind the tile. Tile set over drywall, a shower pan without a proper membrane, or an unvented exhaust fan lets moisture into studs and subfloor. In Seattle’s damp climate, that becomes rot and mold within a few years. A proper remodel includes a full waterproofing membrane on walls and pan, sealed seams and niches, and a flood test before tile goes on.
What changes the price
- Moving plumbing — relocating a toilet, shower or vanity adds plumbing work and usually a permit.
- Tile choice — large-format, natural stone and mosaic tile take more labor than standard porcelain.
- Hidden damage — rot or mold behind old tile must be repaired before rebuilding.
- Shower glass — frameless glass costs more than framed doors or a curtain.
- Room size — primary bathrooms need more tile, fixtures and time.
Tub-to-shower conversions
One of the most requested projects in older Seattle homes. The tub is removed, the base is rebuilt and waterproofed, and a low-curb or curbless tiled shower takes its place. It makes small bathrooms feel larger and is easier and safer to use — a common choice for aging in place.
How long will I be without a bathroom?
A full remodel usually takes 3–6 weeks of construction. If it’s your only bathroom, ask your contractor to phase the work and keep the out-of-service window as short as possible.
FAQ
Do I need a permit to remodel a bathroom in Seattle?
Usually when you move plumbing, add circuits, change walls or add a fan duct. Replacing fixtures in place often doesn’t need one.
Can I save money by keeping the tub?
Yes — re-tiling around an existing tub in good condition costs less than a conversion, as long as the walls behind are dry and sound.
See real examples in our project gallery, including bathrooms we remodeled in Renton.
Get a fixed, written price. Inreal Construction is a licensed Seattle-area general contractor (WA L&I #INREAI*784MG). See our bathroom remodeling in Seattle page or request a free walkthrough — call (425) 474-3124.




