Deck Builders Seattle WA | Deck Replacement Cost, Cedar & Composite Decks | Inreal
Deck builders · Seattle, King, Pierce & Kitsap County

Seattle Deck Builders Who Frame It Right Before They Make It Look Good

Deck replacement, new cedar and composite decks, elevated decks with stairs, covered porches and structural deck repair — built on proper footings, flashed ledgers and code-compliant framing, so your deck outlives the Puget Sound rain instead of rotting under it. Free site visit, written price within one business day.

  • Fixed price in writing. Demo, footings, framing, decking, railing and permit fees — itemized before you sign.
  • Permit and inspection handled. We pull the deck permit, meet the inspector, and fix anything they flag at our cost.
  • 9 years in Washington. Licensed, bonded & insured. 4.9★ from 61 verified Thumbtack reviews.

Price my deck

Size, height and the material you’re leaning toward is enough to start. We ring back the same or next business day to set up a site visit.

Free, no obligation. The written price is yours whether or not you hire us.

4.9
Thumbtack rating across 61 verified jobs
9 yrs
Decks, porches & remodels around Puget Sound
100%
Decks permitted and inspected — no exceptions
WA L&I
Registered contractor, bonded, fully insured
Why Puget Sound decks fail early

A deck doesn’t fail from the top down. It fails from the frame up — and Seattle rain finds every shortcut.

Almost every deck we replace died of the same four causes. None of them are visible once the boards are on, which is why we photograph the frame before we cover it.

The #1 collapse cause

No ledger flashing

The ledger bolts to your house. Without proper flashing, water runs behind it for years, rots the rim joist and sheathing, and the deck lets go from the wall — usually with people on it.

Rot in 5–8 years

Posts sitting in dirt or on pavers

Untreated post bottoms on soil or precast blocks wick moisture nine months a year. The deck sinks, tilts, and the railing goes loose long before the boards look bad.

Fails inspection & resale

Built without a permit

Any deck over 30 inches off grade needs a permit in Washington. Unpermitted decks stall home sales, void insurance claims, and get red-tagged when the neighbour’s new fence draws an inspector.

$5k–$15k redo

New boards on a rotten frame

The cheapest bid is often “just re-deck it”. Composite on a 20-year-old frame with 24-inch joist spacing sags, squeaks, and has to come off again in two years.

How Inreal builds a deck

Footings, flashing and framing first. Then the part you’ll see.

  • Poured concrete footings below frost line with post bases — never posts in soil or on blocks.
  • Flashed, lag-bolted ledger or a free-standing frame if your siding can’t take a ledger. We show you the flashing before it’s covered.
  • Joist spacing matched to the decking — 16″ for cedar, 12″ for composite and hot-tub zones — with joist tape and stainless or coated hardware.
  • Permitted and inspected. Footing and framing inspections passed before a single deck board goes down.
Deck building services

Deck replacement, new construction and structural repair across the Puget Sound

Cedar, pressure-treated or composite — ground-level to elevated — with the stairs, railings, privacy screens and covers that make it usable in a Seattle winter.

Rotted old wood deck before replacement in Seattle

Deck Replacement

Demo of the old deck, new footings and frame, new decking and railing. The most common job we do in older Seattle, Renton and Tacoma neighbourhoods — and the one where the frame matters most.

Demo & haul-awayNew footingsCedar or compositePermit included
12×16 cedar$9,500–$15,000Get estimate →
New cedar deck built on posts behind a white house in Washington by Inreal Construction

New Cedar & Composite Decks

Ground-level and raised decks designed for how you’ll use them: dining zones, built-in benches, privacy screens, lighting. Western red cedar for the look, Trex/TimberTech composite for zero maintenance.

CedarTrex / TimberTechBuilt-in benchesDeck lighting
Composite$60–$95 / sq ftGet estimate →
Elevated second-storey deck with black railings on a two-storey home in Washington

Elevated Decks & Stairs

Second-storey decks, split-level yards and walk-out basements. 6×6 posts, doubled beams, engineered guard-rail attachment and stairs with proper stringers and landings — the parts inspectors look at hardest.

Second-storeyStairs & landingsGuardrails to codeSloped lots
Stairs from$2,500Get estimate →
Deck framing repair: new joists and beams checked with a level

Deck Framing & Structural Repair

Sagging deck? Soft spots? We replace rotted joists and beams, sister what can be saved, re-set posts on real footings, re-flash the ledger and reinforce for hot tubs — without replacing decking that’s still good.

Rot repairLedger re-flashHot-tub reinforcementSistering joists
Typical repair$1,500–$8,000Get estimate →
Covered entry porch with composite decking in Washington

Covered Porches & Patio Covers

Shed-roof and gable covers tied into your existing roofline, front and back porches, pergolas and patio roofs — framed to carry Puget Sound snow and wind loads, with the flashing detail done right.

Front porchPatio roofPergolaRoof tie-in
Covered porch$12,000–$30,000Get estimate →
Deck with black metal railings and stairs built by Inreal Construction in Washington

Railings, Privacy Screens & Fences

Cedar and metal railings, horizontal-slat privacy walls, and fences that match the deck. Built into the deck frame — not screwed to the decking — so they stay tight for years.

Cedar railingCable & metalPrivacy wallGates
Privacy screen$85–$140 / lin ftGet estimate →
Deck replacement cost in Seattle

What a deck actually costs in the Seattle area — before you call anyone

Ranges from our recent King, Pierce and Kitsap County jobs, installed, including demo where noted. Your fixed price comes after a free site visit.

ProjectTypical rangeTimeline
Pressure-treated deck, ground levelInstalled, per sq ft, new footings & frame$35–$50 / sq ft3–5 days
Cedar deck, ground levelWestern red cedar decking & railing$45–$65 / sq ft3–6 days
Composite deck (Trex / TimberTech)12″ joist spacing, hidden fasteners$60–$95 / sq ft4–7 days
Deck replacement, 12×16 ft cedarDemo & haul-away, footings, frame, decking, railing$9,500–$15,0004–6 days
Elevated deck with stairs, ~200 sq ft6×6 posts, doubled beams, stairs, guardrail$18,000–$32,0001–2 weeks
Covered porch / patio coverFramed roof tied into house, per project$12,000–$30,0001–2 weeks
Structural repair: ledger, joists, postsRot replacement, re-flash, new footings$1,500–$8,0001–3 days
Old deck demolition & disposalWhen done alone$1,000–$3,0001 day
Cedar vs composite in the Seattle climate

Which decking should you choose?

Western red cedarComposite (Trex / TimberTech)Pressure-treated
Installed cost$45–$65 / sq ft$60–$95 / sq ft$35–$50 / sq ft
MaintenanceClean + stain every 2–3 yrsWash once a yearStain every 2 yrs, checks & splinters
Life in Puget Sound rain15–25 yrs if maintained25–50 yrs10–15 yrs
Look & feelReal wood, warm, weathers silverConsistent colour, cooler underfoot on grey days, hot in full sunUtility
Best forOwners who love wood and will stain itRentals, ADUs, shaded lots, “never again” ownersBudget, short-term, under a cover
How a deck project runs with Inreal

From site visit to the first barbecue — five steps, no surprises

Most deck horror stories start with “the guy stopped answering”. Here’s exactly who does what, and when, on our jobs.

STEP 1

Quick call

Ten minutes on the phone: rough size, how high off the ground, cedar or composite, and whether there’s an old deck to remove.

Same or next day
STEP 2

Site visit & deck check

We measure the yard, probe the existing ledger and posts, check where concrete and lumber can come in, and sketch two or three layouts with you.

Within 2 days
STEP 3

Written, itemized price

Demo and disposal, footings, framing lumber, decking, railing, stairs and permit fees — each on its own line, with a start date and duration.

Next business day
STEP 4

Permit, demo, footings

We file the deck permit, tear out the old deck, dig and pour footings, and get the footing inspection signed off before any framing goes up.

1–4 weeks for the city
STEP 5

Frame, inspect, finish

Frame goes up, framing inspection passes, then decking, stairs and railing. You get photos every evening and a swept yard when we leave.

3 days – 2 weeks
Recent decks around Seattle

Three decks, three different problems — and what each one cost

A replacement, a covered porch and a hot-tub platform. We photograph every deck at the framing stage so you can see what’s holding it up.

Deck replacement · cedar · 6 working days

Two-level cedar deck with stairs and a privacy fence, in place of a rotted 10×12

The homeowners wanted somewhere to eat outside without the neighbours in view. The old deck came out in a day; new footings, an upper landing off the kitchen door, a stair run down to a lower dining deck and a 6-ft horizontal cedar privacy screen went in over the following week. Cedar throughout, sealed on completion. Cost band: mid-$20k range including demo, permit and fence.

Before: rotted old wood deck behind a blue house in Seattle
Before
Framing stage: upper deck and stairs framed on posts and beams
Framing
After: finished cedar deck with stairs and privacy fence
After
Walkthrough
Covered porch · composite · 4 working days

A dry, covered entry where there used to be one wet concrete step

A back door that opened straight onto a cracked step in the rain. We added a shed roof tied into the existing eave on two posts, a low composite landing with a picture-frame border, and a step down to the path. Grey composite was chosen so it needs nothing but a rinse. Cost band: low-to-mid teens, permit included.

Before: plain back-door entry with a cracked concrete step
Before
Framing stage: porch roof posts, beam and deck joists
Framing
After: covered porch with grey composite decking
After
Structural rebuild · composite · hot tub · 2 weeks

A multi-level deck rebuilt to carry a spa and a stone outdoor kitchen

The owners had already bought the hot tub; the deck under it was never built for 5,000 lb of water. We kept the layout they liked, stripped the decking, rebuilt the beams and joists at 12-inch spacing under the spa zone, added footings, and re-laid composite with a diagonal inlay as the centrepiece. Cost band: upper $30k range with the structural work.

Framing stage: new joists, beams and post bases for a multi-level deck, checked with a level
Framing
After: multi-level composite deck with hot tub and stone outdoor kitchen
After
Inreal Construction owner on a finished cedar deck with privacy fence in Seattle
9years in Washington
What you get in writing

Six things every Inreal deck contract includes

WA-registered, bonded, insured

Our L&I registration, bond and liability certificate go in the folder with your quote, so you can verify us before you sign anything.

Inspections pass or we fix it free

Footing and framing inspections are on us. A correction the inspector asks for is never billed to you.

One price, held for 30 days

What’s on the quote is what’s on the final invoice. If you add a bench or a gate mid-build, you see the cost before we buy the lumber.

Framing photos before the boards go on

Footings, flashing, hangers and joists — photographed and sent to you. Handy for the inspector now and for the buyer when you sell.

Yard left the way we found it

Old decking hauled off the same day it comes down, beds and lawn boarded over where we walk, sawdust and offcuts gone every evening.

12-month workmanship warranty

A board that cups, a baluster that loosens, a stair that squeaks — call us and we come back and sort it, no charge.

From Thumbtack

Homeowners on how the job actually went

4.9
★★★★★
61 reviews · all verified by Thumbtack
Cary B. ✓ Verified
They built steps for our back deck and also a fence and gate. Alex is great to work with and Gary and the crew did a fantastic job! We are definitely having them come back.
Clark B. ✓ Verified
They did excellent work. Exactly what I needed. Flexible for work add-ons as well. I would recommend them and use them again.
Subha P. ✓ Verified
We had a great experience with Inreal — they were responsive and took full ownership of the project and completed everything as per plan.
Rudi H. ✓ Verified
Bohdan takes his job seriously and goes above and beyond. Friendly and professional.
Where we build decks

Seattle neighbourhoods, the Eastside, Tacoma and the Kitsap Peninsula

Ballard, West Seattle, Beacon Hill, Shoreline and Renton keep our deck crew busiest — older homes, older decks. We also cross the bridge to Bellevue and Redmond, and take the ferry or drive round to Bremerton and Port Orchard. Anywhere within about 50 miles of Seattle is in range.

King County

  • Seattle
  • Bellevue
  • Redmond
  • Kirkland
  • Renton
  • Kent
  • Issaquah
  • Federal Way
  • Shoreline
  • SeaTac

Pierce County

  • Tacoma
  • Gig Harbor
  • Puyallup
  • Lakewood
  • Fife
  • Key Peninsula

Kitsap County

  • Bremerton
  • Port Orchard
  • Silverdale
  • Poulsbo
  • Bainbridge Island
  • Olalla
  • Burley
  • Wauna
Deck building FAQ

Questions Seattle homeowners ask before hiring a deck builder

How much does it cost to replace a deck in Seattle?

A full replacement of a 12×16 ft deck — demolition, new footings and frame, cedar decking and railing — typically runs $9,500–$15,000 in the Seattle area. The same deck in composite is $13,000–$20,000. Elevated decks with stairs start around $18,000. You get a fixed, itemized price after a free site visit.

How much does a new deck cost per square foot?

Installed, including footings and framing: pressure-treated $35–$50, cedar $45–$65, composite $60–$95 per square foot. Stairs, railings, height and site access move the number; we list each one separately in the estimate.

Do I need a permit to build a deck in Washington?

Yes, for almost every deck. In Seattle and most King, Pierce and Kitsap County cities, any deck more than 30 inches above grade, attached to the house, or over about 200 sq ft requires a building permit and inspections of the footings and framing. We pull the permit and attend the inspections — it’s included in the price.

Cedar or composite — which is better for the Seattle climate?

Composite (Trex, TimberTech) wins on maintenance and lifespan in nine months of rain — wash it once a year and it lasts 25+ years. Cedar costs 25–35% less, looks and feels like real wood, but needs cleaning and stain every 2–3 years or it greys and checks. Both need the same properly framed, 12″-or-16″-on-centre structure underneath.

Can I just replace the deck boards and keep the frame?

Sometimes. If the joists, beams, posts and ledger are sound, dry and correctly spaced for the new decking, re-decking saves 30–40%. We check the frame on the site visit and tell you honestly. Putting composite on a 24″-spaced or partly rotted frame is the most common mistake we get called to undo.

How long does it take to build a deck?

A ground-level deck takes 3–6 working days once the permit is issued. Elevated decks with stairs run 1–2 weeks; covered porches 1–2 weeks. Permit review adds 1–4 weeks depending on the city. You get a dated schedule with the estimate.

Can my deck hold a hot tub?

Only if it was framed for it. A filled hot tub weighs 3,000–6,000 lb, which needs 12″ joist spacing, doubled beams and extra footings under the tub zone. We reinforce existing decks or frame new platforms specifically for spas — engineering included.

What are the signs my deck needs replacing rather than repair?

Soft or spongy spots, a ledger that’s pulling away from the house, posts you can push a screwdriver into, rusted or missing hangers, and a frame with 24″ joist spacing under composite. One or two of these can be repaired; three or more usually means the frame is done and replacement is cheaper long-term.

Is Inreal a licensed deck contractor in Washington?

Yes. We hold an active Washington State L&I contractor registration, the required surety bond, general liability insurance and workers’ compensation for the crew. You can look us up on the L&I “Verify a Contractor” page, and we attach the certificates to every deck quote.

Do you also do house framing, additions and porches?

Yes — decks are one part of our structural work. We frame additions, ADUs, garages, roofs and covered porches across the Puget Sound. See our frame construction services.

Free deck site visit · written price next business day

Ready for a deck that’s still solid in 2046?

Send us the basics and the person who’ll build it calls you back — not a call centre. The quote is free, line-by-line, and holds for 30 days.

(425) 474-3124

Monday to Saturday, 8 am – 5:30 pm · Seattle and the greater Puget Sound

Start my deck quote

Two minutes to fill in. We call you back by the next business day.

We never share your details. No follow-up spam.