Full Bathroom Renovation — A Complete Gut Remodel, Down to the Studs
Inreal Construction delivered a complete bathroom renovation — a full gut remodel where everything was replaced from the ground up. New electrical wiring, new plumbing, new tile, fixtures, and cabinetry combined into a bold, modern bathroom with warm and dramatic contrast.
Full Gut Remodel — Everything Replaced
This wasn’t a cosmetic update. Our team replaced everything down to the studs:
- Complete demolition — walls, floors, and old fixtures removed
- New electrical wiring — outlets, lighting circuits, and modern sconces
- New plumbing — supply lines, drains, faucets, and rough-in for the vanity and toilet
- Waterproofing & new substrate before tile
Premium Tile Installation
- Fluted wood-look porcelain wall tile — warm, textured feature wall
- Marble-look porcelain in the shower and wet areas
- Black-and-white geometric floor tile — a striking diamond pattern
- Precision tile-leveling system for a flawless, lippage-free finish
- Modern Fixtures & Finishes
- Custom black double vanity with a quartz countertop and undermount sinks
- Brushed gold faucets, sconces, and hardware
- Gold-framed oval mirrors and linear LED wall sconces
- New comfort-height toilet
The Result
A high-end, magazine-worthy bathroom — warm fluted walls, dramatic black cabinetry, gold accents, and a bold geometric floor. A full before-and-after transformation built to last, inside and out.




