Full Bathroom Renovation — A Complete Gut Remodel, Down to the Studs

Inreal Construction delivered a complete bathroom renovation — a full gut remodel where everything was replaced from the ground up. New electrical wiring, new plumbing, new tile, fixtures, and cabinetry combined into a bold, modern bathroom with warm and dramatic contrast.

Full Gut Remodel — Everything Replaced

This wasn’t a cosmetic update. Our team replaced everything down to the studs:

  • Complete demolition — walls, floors, and old fixtures removed
  • New electrical wiring — outlets, lighting circuits, and modern sconces
  • New plumbing — supply lines, drains, faucets, and rough-in for the vanity and toilet
  • Waterproofing & new substrate before tile

Premium Tile Installation

  • Fluted wood-look porcelain wall tile — warm, textured feature wall
  • Marble-look porcelain in the shower and wet areas
  • Black-and-white geometric floor tile — a striking diamond pattern
  • Precision tile-leveling system for a flawless, lippage-free finish
  • Modern Fixtures & Finishes
  • Custom black double vanity with a quartz countertop and undermount sinks
  • Brushed gold faucets, sconces, and hardware
  • Gold-framed oval mirrors and linear LED wall sconces
  • New comfort-height toilet

The Result

A high-end, magazine-worthy bathroom — warm fluted walls, dramatic black cabinetry, gold accents, and a bold geometric floor. A full before-and-after transformation built to last, inside and out.